Home / All services / Rooftop solar in Gurgaon

Gurgaon · Residential and commercial

Rooftop solar in Gurgaon, designed from your electricity bill.

Xenaud is based in Gurgaon. We survey your roof, size the plant against the units you actually use, and handle design, installation and maintenance under one project manager. Homes, housing societies, offices and small factories all start the same way, with your bill and a roof visit.

We work in Gurgaon, Delhi, Noida, Ghaziabad and Faridabad.

What you get with a Xenaud rooftop plant

Sized from your bill

We turn your monthly bill into units, then into kWp, and cap the result by shadow-free roof area and your sanctioned load.

Drawn before it is built

Every plant gets a single line diagram, a bill of materials and a mounting layout before any equipment is ordered.

One team on site

Civil, mechanical and electrical work run under one project manager, so cost and design stay in line.

Hybrid when it pays

If outages cost you money, we price a hybrid plant with battery backup next to a standard on-grid plant.

Paperwork help

We help prepare the documents your distribution company asks for when you apply for net metering.

Maintenance and support

Ongoing service keeps generation up. We set out cleaning and inspection in the proposal.

How a project runs

Survey

We visit the roof, study your bill and load, and map shade and structure.

Design

You get a single line diagram, layout, bill of materials and a business case.

Install

Civil, mechanical and electrical work run under one project manager.

Maintain

Monitoring and service keep the plant producing and the bill down.

Common questions

How much roof area does a rooftop solar plant need?

About 9 m² of shadow-free roof per kWp once row spacing and walkways are counted. A 5 kWp plant needs roughly 45 m².

Does rooftop solar work well in Gurgaon's dust and heat?

Yes. Dust and very hot panels lower output, so we allow for losses when we estimate yield, about 4 units per kWp per day over the year, and we plan regular cleaning as part of maintenance.

Is there a subsidy for home rooftop solar?

For homes, the central PM Surya Ghar scheme gives ₹30,000 per kW up to 2 kW and ₹18,000 for the third kW, capped at ₹78,000. Rules and state incentives change, so we check the current terms before we quote.

How long does installation take?

The installation itself usually takes a few days for a home-scale plant. Approvals and equipment lead time decide the rest, and we give a schedule in the proposal.

Related services

See all services and areas →

Ready for a survey plan?

Send us your bill and roof details. We reply with the next step.

Free consultation